BID NEWS CONSTRUCTION REPORTS DATE UPDATED 04-29-99 TULSA: TULSA PUBLIC SCHOOLS BOOKER T. WASHINGTON HIGH SCHOOL ADDITION & REMODEL (1631 East Woodrow Place) ESTIMATE: $2 Million SQ FT: Upper & Lower Level - Approximately 22,000 SF STATUS: Advertised For Bid BID DATE: 05-04-99 02:00 PM PRE-BID 04-13-99 10:00 AM CONFERENCE: Pre-Bid Conference To Be Held At The Site In The Library Followed By An On-Site Examination Owner Taking Lump Sum Bids Due In Owner's Office 5% Bid Bond - Certified Check Acceptable 100% Performance, Maintenance & Statutory (Payment) Bonds Plans Obtainable From Architect - $250 Deposit (2-Sets) (+ $35 If Mailed)-Refundable To Unsuccessful Bidders If Documents Returned Within 10 Days After Bid Date. OWNER: Tulsa Public Schools ISD 72I008 Facilities Bond Projects Office 3027 S. New Haven - Room 613, Tulsa OK 74147-0208 PHONE 918 746-6514 FAX 918 746-6141 ARCHITECT/ Dewberry Design Group, Inc. ENGINEER: 1350 South Boulder, Suite 600, Tulsa OK 74119-3216 PHONE 918 587-7283 FAX 918 587-0071 BIN # 146 TUL PROJECT # 3028 Contractor's Qualification Statement Is Required. Seven (7) Day Prior Approval On Substitutions Required. Demolition, Sitework, Piers, Concrete Paving, Drainage Pipework & Fittings, Landscaping, Cast-In-Place Concrete, Brick & Concrete Block Masonry, Structural Steel, Metal Framing, Metal Joists & Decking, Metal Fabrications, Carpentry, Architectural Woodwork, Waterproofing, Vapor Retarders, EIFS, Firestopping, Membrane Roofing, Flashing & Sheet Metal, Joint Sealers, Metal Wood & Access Doors, Entrances & Storefronts, Hardware, Glazing. Plaster, Gypsum Board, Acoustical Ceilings, Resilient Flooring, Carpet, Painting, Marker Boards, Toilet Compartments, Signage, Roof Scuttle, Fire Extinguishers, Elevators, Basic Mechanical, Mechanical Insulation, Fire Sprinkler System, Plumbing, HVAC, Fans, Ductwork, Basic Electrical, General Lighting, Fire Alarm System, Intercom System, Clock System.